Informational Guide to Mumbai Airport (BOM) - Non Official

9I601 Alliance Air - Flight Status

Below, you can find details about Alliance Air flight 9I601, which currently operates between the airports of Mumbai - Mumbai Chhatrapati Shivaji International Airport (Airport Code BOM) and - (Airport Code JLG).
This flight data pertains specifically to the flight's details for Monday, December 02, 2024.

9I601 On Time performance:
51
We have calculated the percentage of flights that arrived within 15 minutes of their scheduled time, or earlier, based on real flight data from the last 3 months. More about punctuality and delays

Flight Status

9I601 Alliance Air to

En Route
Flight Status for Monday December 02, 2024
This flight is also scheduled for Tomorrow (December 04, 2024). See it here

Airline information

Alliance Air
Alliance Air
Equipment: ATR 72

Departure

Mumbai (BOM)
December 02, 2024
Mumbai Chhatrapati Shivaji International Airport
Scheduled Departure Time:
18:15
Terminal:
1
Gate:
-
Scheduled Departure Time: 18:15

Arrival

(JLG)
December 02, 2024
Scheduled Arrival Time:
19:15
Terminal:
-
Gate:
-
Scheduled Arrival Time: 19:15
Disclaimer
The information displayed on this website is gathered from third-party providers with a wide reputation on the sector, which in turn obtain the information from the airlines. This data is provided only for informative purposes. www.mumbaiairport.com assumes no responsibility for loss or damage as a result of relying on information posted here. Please contact your airline to verify flight status.

Additional Information

Which is the frequency of flight 9I601?
The flight 9I601 is currently not scheduled at Mumbai Airport (BOM).

Which is the distance of flight 9I601?
The distance between the two airports is 8213 kilometers.

Alternative Flights

Alliance Air is the only airline operating the route from Mumbai to .

Punctuality and delays

We have gathered data from recent months and present below an analysis of how timely the flights have been.

In terms of On-Time Performance, by analyzing the flight data from the last three months, spanning from September 03, 2024 to December 01, 2024, we have obtained these figures.
Total number of flights: 45
On Time: 23 ( 51 % )
Moderate Delay: 5 ( 11 % )
Significant Delay: 7 ( 16 % )
Major Delay: 10 ( 22 % )
Canceled: 0 ( 0 % )
Diverted: 0 ( 0 % )

Average Delay: 33 minutes.
Delays analyzed by Weekday: We have gathered available data from last six months, spanning from August 08, 2024 to December 01, 2024. Next, you can observe the results broken down by day of the week: number of flights analyzed, on-time performance per day, and average delay per day.

Delays analyzed by Month: We have gathered available data from last twelve closed months, spanning from August 08, 2024 to November 29, 2024. Next, you can observe the results broken down by month: number of flights analyzed, on-time performance per month, and average delay per month.

Last Past Flights 9I601

Date
Departure
Arrival
Duration
Aircraft
Status
Monday
02 December
18:15
Mumbai (BOM)
19:15
(JLG)
ATR 72
ATR 72
Sunday
01 December
19:14
Mumbai (BOM)
19:49
(JLG)
ATR 72
ATR 72
Landed - Delayed
Friday
29 November
18:53
Mumbai (BOM)
19:31
(JLG)
ATR 72
ATR 72
Landed - Delayed
Wednesday
27 November
19:26
Mumbai (BOM)
20:01
(JLG)
ATR 72
ATR 72
Landed - Delayed
Monday
25 November
19:24
Mumbai (BOM)
20:14
(JLG)
ATR 72
ATR 72
Landed - Delayed
Sunday
24 November
18:15
Mumbai (BOM)
19:15
(JLG)
ATR 72
ATR 72
Friday
22 November
18:58
Mumbai (BOM)
19:35
(JLG)
ATR 72
ATR 72
Landed - Delayed
Wednesday
20 November
18:15
Mumbai (BOM)
19:15
(JLG)
ATR 72
ATR 72
Monday
18 November
19:50
Mumbai (BOM)
20:27
(JLG)
ATR 72
ATR 72
Landed - Delayed
Sunday
17 November
19:28
Mumbai (BOM)
20:03
(JLG)
ATR 72
ATR 72
Landed - Delayed